Close

Power Cable Trenching & Laying

We have extensive experiences in power engineering, and carried out power cable trenching and laying for CLP from 2007 to 2011.
Since 2009, we have further been the contractor of Hongkong Electric in the construction and maintenance of trenching / cable laying and contractual works in the areas of Hong Kong, Ap Lei Chau, Lamma Island and outlying islands.


Our experience includes a 132kV cable diversion project of Hongkong Electric in the Wanchai waterfront involving open trench and hang-dig tunnel of 8m depth, demonstrating our high level of technical and management skills.